Recessed Installation for Outdoor


1. The depth of the outdoor foundation pit should be between 50-80 cm

and a drainage outlet should be reserved.As the picture shows.








2. Build a 30cm-65cm steel structure in the foundation pit

(note: the steel structure supports A height of 13cm-17cm

should be reserved between the support surface and the ground;

Adjacent steel structures Structure distance is 500mm/1000mm)








3. Place the ground bracket on the surface of the steel structure,

As shown in the figure (between adjacent ground brackets Distance is 500mm/1000mm)








4. The positioning hole at the bottom of the box is connected

with the positioning columnon the surface of the ground support;

Connect and fix the positioning holes of the cabinet with the four ground supports

(The arrow on the back of the cabinet The orientation must be the same)

Adjust the height of the ground support so that the surface of

the screen is higher than the ground level, As shown in the figure.









5. Connect the power line and signal line on the back of the box to another box in turn 

(Note: The orientation of the cabinets is the same).








6. The box body and the box body are connected sequentially

according to the above content, As shown in the figure shown.









5. After the screen body is installed, You can decide whether to

install the package according to actual needs.Enhanced aesthetics.









6. During the use of the screen body,Regular maintenance is required

to ensure the use time of the screen body.